We have removed the old Oil Tank from the rear outbuildings, the Boiler and the Central Heating System from the house. The end wall has been secured with a metal cross support and the front elevation cracks were repaired, once a chimney stack lintel was installed by Aussourd Bros.



We decided to install a new Fosse Septic and Reservoir in advance of any renovation work, so that we can use the garden and not have any plans subsequently disturbed. We have now tidied up the rear with a Gravel Patio Area, that eventually we will