Today, I concreted in the back edge with stone fillers to ensure strength and once full dried when I return in December, will render in and the whole wall both sides, once the old render covering is removed!
I took all morning and longer than I expected, but it was work that had to be right to find the correct stone pieces and I worked from the bottom to the top.