So, having laid a Sand Base on the old, stable stone floor last week, today I was able to proceed with laying the DPC to both rooms, as well as the Polystyrene Insulation Boards, that I taped.
West Side with Grid |
East Side with Leveller |
I decided install 4 wooden, 5cm thick lengths in each room running front to back, to allow me to lay the concrete and be used to secure the floor as level as possible. To help I have installed cross supports to raise the level lengths where needed to achieve as level a floor as possible!
So, now I have a 2 day task to mix and lay the concrete in each room and leave it for a week to settle and harden, whilst I attempt more task upstairs.