Thursday 3rd February 2022
Frosty again this morning warmed up by mid day and I started by doing a tidy up of things that I was too tired to do yesterday. I opened the pack of 6off 40x40cm Toughed Glass panels I ordered from Aspire Glass and took the labels off and tested against all the small window holes, as I explained yesterday.
A couple of openings needed to have protruding stone removed to allow a fit and I then proceeded to use the support poles with a wooden block to support each glazed panel. I applied Expanded Foam to each stone surround and applied a smaller amount to each panel, before presenting them to the opening and resting on the support.
East End Floor Window |
East Front Window |
These were left for 30 minutes in which time the foam dries a little and can then be pressed and compressed inside and out to create a firm fit. I will clean up next week, once all is firm and dry. On the exterior I will render to seal and apply a White Coating of Bedec Masonry Paint to maximise the reflection into the interior.
The interior of each wall will be surrounded by the 5cm Insulation Board, that I will shape to create a larger opening inside and render, plus use of the White Bedec to reflect the light inside.