Saturday 19th February 2022
An easier day, as I cleared upstairs of all the plasterboard offcuts and swept up. I also removed the loose old render from the West Gable End to ensure good adhesion of the plasterboard adhesive.
As I plan to fix the board to the wall next week, I carried out a test on the electrical cable runs, as I did in La Grenier in La Maison. I connected a lamp to the end of the run and a plug to the fuse box end, that I connected to an extension lead to provide power. So far so good and will finish all the run tests tomorrow. It has highlighted that I forgot to run a cable to the downstairs East Side for the under floor heatmat, despite my checking! So will, add a cable run tomorrow.
Once all done, I will fix all the upstairs boards to the walls and then cut and fix all the downstairs wall boards next week.