Monday 27 February 2006

Colombage Installed – February 2006

The colombage downstairs was going in by end February 2006 and all the window openings and oak support frames were installed by this time, as well as the hole for the fosse drainage had been started.

Whilst the weather had left a mark, with a very muddy circle around the Grange, it was noticeable that the site was being kept clear and well organised.