Sunday 22 April 2018

Renovation Progress Spring 2018


During the Spring 2018 and the cold weather I spent and very productive 9 weeks in Colondannes and on the house, getting more completed that originally planned and including:

  • Velux Sun Tunnel Installed by Mick Elkins that proved easier him than it would of for me.  So we now have the Sun Tunnel Windowed installed in the rear of the roof, ready to shine daylight through into the new Bathroom ceiling, once all installed.  The amount of light into the loft suggests that this is going to be successful.  Having removed the ceiling subsequently, I have now made the tunnel hole in the loft floor in the right position to illuminate the central area of what will be the bathroom.
  • Removed Ceiling Plaster and Lathe from Bedroom 3, Bathroom and all of Downstairs and finished what I started in November 2017 in Bedrooms 1 & 2
  • Sprayed all of the Ceiling Beams and wooden floor boards now exposed by the removal of the ceilings
  • Re-position the Kitchen Stove Flue before constructing the downstairs Partition Wall, as this Flue needed to be moved out 5cm to provide full clearance of the new wall and plasterboard.  This proved easier than expected and went well




















  • Remodel Landing Window to reduce the lower height and block up to match the exterior level of the small window in Bedroom 2.  This was Nick’s suggestion to enable the proposed new roof of the Garden Room to be the same height of the existing Boiler Room that will be the new Utility Room.
  •  New Windows Measurement were taken by Francis of SAS Adams, as well as a new front door and an order was placed for the supply and fitting of all the windows. These will be supplied, double glazed and pre painted. It is be a while as they are very busy, but that is no problem and the new door will wait until the downstairs floor has been skimmed level all over.
Partition Framing in wood was completed as follows:

Bedroom 2 Door

Bedroom 2 Back


Bathroom Door to Bed 3

Bathroom Back Wall

Downstairs Loo Door

Bathroom Main Door


Bathroom from Stairs


Kitchen Exterior Side Wall

Bedroom 1 Front

Bedroom 3 Door to Bathroom
  • Downstairs Loo Floor


    Downstairs Loo Floor
  • Downstairs LOO Floor was installed and I used the same boards as in Bedroom 2 that proved to be excellent quality and produced a good result.This is also insulated underneath

Downstairs Loo Door

    Bathroom Layout Plan
  • Bathroom Layout Plan was determined with a view to maximise the space, and so the services are  restricted to the back and barn walls and the toilet waste is in the corner and drops to the downstairs loo and then out to the fosse in the back garden.










    New Post Box
  • New Post Box was created as a bit of distraction work when other work was completed each day.  This was created with Breeze Blocks and then rendered, initially with Cement and then to create a fine finish render cement, so I could have not used the cement render.  You learn as you go!  Not sure yet if I should paint it?

This will now be easier for the van to drive up and drop the post in and allow us to plan for a gate further up the drive in the future.



  • Planned Tasks for May Visit
1.   Hang Bedroom 3 and Loft Doors
2.   Plastering estimate
3.   Utility door knock through
4.   Fit utility kitchen door
5.   Knock down Outside Loo Wall
6.   Remove Outside Loo Floor
7.   Remove Windows
8.   Stairs-Loft Partitioning