Pipe Work and Pointing – May 2006


By mid May, the water pipework was in the process of being installed and the radiators had been positioned upstairs. We were having under floor heating throughout downstairs and this was not yet planned to start.

It was a pleasing surprise to see the exposed stone walls had been pointed and were looking fantastic. We had decided to only leave the West Side walls and around the Barn Door as exposed feature walls, with the other being insulated and boarded.