Summer 2020 Task List

      Looking forward to returning and hopefully completing the work on La Maison Grise this summer.  The following is the Task List planned for completion and hightlighted are key major tasks:· Secure Toilet Bowl

·      Tile Shower Top
·      Grout Bath
·      Seal Bath & Shower Edges
·      Fix Wood Stove Hearths
·      Seal Skirting – Downstairs
·      Seal Vinyl Edges
·      Table Top Oak
·      Fit Ceiling Roses
·      Get Floor Sander – Leroy Merlin
·      Sand Landing, Bed1 & Bed 3 Floors
·      Get Tap PER Connectors
·      Fix PER Connectors in Loo & Bath Basins
·      Move Kitchen Units to House
·      Kitchen Loose Layout
·      Fix Kitchen Units
·      Construct Back Frame & Plasterboard
·      Utility Units Layout
·      Get Render 65 – Tout Faire
·      Render GR Back Wall
·      Finishing Grout GR & Utility Floors
·      Fit Door Handles