Tuesday 8 January 2019

February - March 2019 Task Plan


Well 2019 has now started and my next visit is planned for February and March 2019.  The following is my Task List for the work elements planned:

  •   I.        Mark Up Wall Channels
  • II.        Channel Walls for Electrics
  • III.        Label all Water and Electric Points
  • IV.        First Fit Plumbing
  • V.        First Fit Electrics
  • VI.        Level Shower Floor Base
  • VII.        Plasterboard ½ Partition Wall
  • ·       Loo
  • ·       Wardrobe Bed 1 and 2
  • ·       Under stairs
  • ·       Stairs/Loft
  • VIII.        Base Render Coat to Low Garden Wall
  • IX.        Adjust Loft Door
  • X.        Apply DitraMat to Shower Floor
  • XI.        Secure Shower Base
  • XII.        Shower Side Walls
  • XIII.        Measure Dimensions of the Piggery