Wednesday 12 April 2006

Windows In – April 2006

Before we knew it Easter was upon us in early April and it was pleasing to see all the windows and doors had been installed and the Grange was now water tight. The plasterboard had been installed to create the utility room downstairs and the bedrooms upstairs. In addition, the first fix electrics were all installed.

It was now possible to get a real feeling of the proportions of the space and height we had with our 3 metre ceiling both down and upstairs.