Wednesday 10 November 2021

La Studio - Hayloft Door Edging

Upon inspection, I  realised that strangely the Back wall side of the new door opening edge had more gaps and stone removed, compared to the front side, which needs stone to be cut to level up.

Today, I concreted in the back edge with stone fillers to ensure strength and once full dried when I return in December, will render in and the whole wall both sides, once the old render covering is removed!

I took all morning and longer than I expected, but it was work that had to be right to find the correct stone pieces and I worked from the bottom to the top.