Saturday 13 November 2021

La Studio - Renovation Video......work so far

The end of the autumn visit has arrived and today was a final tidy up day, in readiness for my return to the UK.

This brief video is summary of the work status so far, as has been indicated in the previous posts and pics.


https://youtu.be/xXMYvwxnurc

I will be back for a brief visit in December, but will return in January 2022 to undertake preparation work on both floors, run the electric cables and install insulated plasterboard to the ceilings and all external walls.