Thursday 17 February 2022

La Studio - Upstairs Low Wall Insulated Boarding

Thursday 17th February 2022     

Had a good day and succeeded to get all the Lower Wall Insulated PB in both the East and West Sides cut and ready for securing to the wall.  Installed a Full 2.4 x 1.2 Board down the back wall by the stairs and all the electric socket holes drilled in position.

East Back Lower Wall

East Front Lower Wall









West Back Lower Wall
West Front Lower Wall








Made all of the low board 50mm taller than needed and removed the poly insulation from the back of the top 5cm to allow to overlap the bottom of the roof boarding.

A few adjustments needed and just to to double check all the electric cabling position tomorrow, before starting the work to cut both Gable Ends- East and West boards and place into position ready for the adhesive mix to secure each board to the stone walls.